Drapers Hall











Project details:

  • Strip off existing slate roof coverings 
  • Strip off existing asphalt flat roof covering

Main pitch roof:

  • Install new breathable membrane 
  • Install new Welsh natural slate 
  • Install code 5 lead ridge and copings 
  • Install code 5 lead straps 
  • Install code 5 lead box gutter with timber lead roll detail

Flat roof:

  • Install 2 layers hot asphalt roof covering 
  • Install solar reflective coating 
  • Install code 5 lead flashings to all roof/wall abutments 
  • Install code 5 lead flashings to parapet and top of wall/roof edge