Project details:
- Loft conversion and rear back edition works
- Remove existing roof coverings, stack to one side for reinstalling
- New breathable membrane
- New roofing batten
- New Velux roof windows 3 layer torch on felt to new dormer roof
- Composite cladding to front and sides of dormer
- New code 5 lead flashings to roof/wall abutments